Project Title: Blackburn College Phase 2
Completed: July 2009
Contract Duration: 9 Months
Client: Blackburn College
Main Contractor: Bardsley Construction
Contract Value: 2.8 Million
Description:
The construction of a 5 storey educational facility, in the heart of Blackburn town centre was completed with a fully integrated Mechanical and Electrical services installation, the building achieved a BREEAM rating of “Very Good”.
Services Undertaken:
- Full contract management
- Full design, CAD, working drawings
- GSHP installations
- Photovoltaic installations
- LPHW pipework installation
- MCW AND DHW pipework installations
- Gas pipework installations
- Boiler plant installation
- Hot Water plant installations
- VRF & Air conditioning installation
- Ventilation Supply and Extract ductwork
- Soils and wastes
- Sanitaryware
- Rainwater pipework
- Siphonic Rain water Installations
- Rain water Harvetsing
- Pipework and Ductwork Insulation
- Passive Natural Ventilation Scheme
- Under-floor heating installation
- Specialist kitchen ventilation
- BMS installation
- Provision of Main Switchboard, Sub Distribution Boards
- Main and Sub Main Cabling
- Containment Installation-Cable Tray/Basket/Trunking/Dado & Skirting Trunking
- Lighting Installations
- Emergency Lighting Installations
- Lighting Control Systems
- General Power, Earthing & Bonding
- Fire Alarm Installations
- Access Control Systems, CCTV Installations, Disabled Refuge Alarm Systems
- Induction Loop Systems
- TV Aerial Installations
- Data & Telephone Structured Wiring
- Power and Control Cabling to Mechanical Services
- Lightning Protection
- Inspection and Testing
- Chlorination of services
- Flusing and water treatment
- OMI Documention
- Testing and commissioning of all associated services
- Client Demonstrations