Project Title: Blackburn College Phase 2

Completed: July 2009

Contract Duration: 9 Months

Client: Blackburn College

Main Contractor: Bardsley Construction

Contract Value: 2.8 Million

Description:

The construction of a 5 storey educational facility, in the heart of Blackburn town centre was completed with a fully integrated Mechanical and Electrical services installation, the building achieved a BREEAM rating of “Very Good”.

Services Undertaken:

  • Full contract management
  • Full design, CAD, working drawings
  • GSHP installations
  • Photovoltaic installations
  • LPHW pipework installation
  • MCW AND DHW pipework installations
  • Gas pipework installations
  • Boiler plant installation
  • Hot Water plant installations
  • VRF & Air conditioning installation
  • Ventilation Supply and Extract ductwork
  • Soils and wastes
  • Sanitaryware
  • Rainwater pipework
  • Siphonic Rain water Installations
  • Rain water Harvetsing
  • Pipework and Ductwork Insulation
  • Passive Natural Ventilation Scheme
  • Under-floor heating installation
  • Specialist kitchen ventilation
  • BMS installation
  • Provision of Main Switchboard, Sub Distribution Boards
  • Main and Sub Main Cabling
  • Containment Installation-Cable Tray/Basket/Trunking/Dado & Skirting Trunking
  • Lighting Installations
  • Emergency Lighting Installations
  • Lighting Control Systems
  • General Power, Earthing & Bonding
  • Fire Alarm Installations
  • Access Control Systems, CCTV Installations, Disabled Refuge Alarm Systems
  • Induction Loop Systems
  • TV Aerial Installations
  • Data & Telephone Structured Wiring
  • Power and Control Cabling to Mechanical Services
  • Lightning Protection
  • Inspection and Testing
  • Chlorination of services
  • Flusing and water treatment
  • OMI Documention
  • Testing and commissioning of all associated services
  • Client Demonstrations