BAe warton

Project Title: Boiler Replacement, Office Building

Completed: December 2013

Contract Duration: 3 Months

Client: BAE Systems

Main Contractor: BAE Systems

Contract Value: £114,388

Description

A direct works package from BAE for the design and installation of a new boiler plant installation within an existing office building to replace the existing plant which had come to the end of their economic life.

Services Undertaken:

  • Full contract management
  • CAD, working drawings
  • Removal of existing plant and pipe work
  • Installation of new gas fired boilers
  • Installation of new gas fired water heaters
  • Installation of new circulating pumps
  • Installation of new pressurisation unit
  • Thermal insulation
  • Installation of new flues
  • Associated builderswork
  • Flushing and chemical dosing of LPHW installations
  • BMS installation
  • Chlorination of services
  • Flusing and water treatment
  • OMI Documention
  • Testing and commissioning of all associated services.
  • Client Demonstrations