Project Title: Trafford College

Completed: September 2014

Contract Duration: 18 months

Client: Trafford College

Main Contractor: ISG Northern

Contract Value: 2.1 Million

Description:

A phased refurbishment of the existing 8000m2 college building bringing the teaching facilities upto date, providing a new high tech science and technology centre.

Services Undertaken:

  • Full contract management
  • Full design, CAD, working drawings
  • GSHP installations
  • Photovoltaic installations
  • LPHW pipework installation
  • MCW AND DHW pipework installations
  • Gas pipework installations
  • Boiler plant installation
  • Hot Water plant installations
  • VRF & Air conditioning installation
  • Ventilation Supply and Extract ductwork.
  • Soils and wastes
  • Sanitaryware
  • Rainwater pipework
  • Pipework and Ductwork Insulation
  • Passive Natural Ventilation Scheme
  • Under-floor heating installation.
  • BMS installation
  • Compressed air installations
  • Provision of Main Switchboard, Sub Distribution Boards.
  • Main and Sub Main Cabling.
  • Containment Installation-Cable Tray/Basket/Trunking/Dado & Skirting Trunking.
  • Lighting Installations.
  • Emergency Lighting Installations.
  • Lighting Control Systems.
  • General Power, Earthing & Bonding.
  • Fire Alarm Installations.
  • Access Control Systems, CCTV Installations, Disabled Refuge Alarm Systems.
  • Induction Loop Systems.
  • Data & Telephone Structured Wiring.
  • Power and Control Cabling to Mechanical Services.
  • Lightning Protection.
  • Inspection and Testing.
  • Chlorination of services
  • Flusing and water treatment.
  • OMI Documention
  • Testing and commissioning of all associated services.
  • Client Demonstrations