Project Title: Blackpool 6th Form College Phase 1

    Completed: June 2009

    Contract Duration: 12 Months

    Client: Blackpool 6th Form College

    Main Contractor: Bardsley Construction

    Contract Value: 1.23 Million

    Description:

    A development of three linked, high specification teaching blocks were constructed, to bring the existing 6th Form College Campus into a new era. The new scheme produces excellent conditions for students to further develop their learning careers. The building benefits from a large proportion of natural ventilation with a BREEAM rating of “Very Good”.

    Services Undertaken:

    • Full contract management
    • Full design, CAD, working drawings
    • LPHW pipework installation
    • MCW AND DHW pipework installations
    • Gas pipework installations
    • Boiler plant installation
    • Hot Water plant installations
    • VRF & Air conditioning installation
    • Ventilation Supply and Extract ductwork.
    • Soils and wastes
    • Sanitaryware
    • Rainwater pipework
    • Pipework and Ductwork Insulation
    • Passive Natural Ventilation Scheme
    • BMS installation
    • Chlorination of services
    • Flusing and water treatment.
    • OMI Documention
    • Testing and commissioning of all associated services.
    • Client Demonstrations