Project Title: Boiler Replacement, Office Building
Completed: December 2013
Contract Duration: 3 Months
Client: BAE Systems
Main Contractor: BAE Systems
Contract Value: £114,388
Description
A direct works package from BAE for the design and installation of a new boiler plant installation within an existing office building to replace the existing plant which had come to the end of their economic life.
Services Undertaken:
- Full contract management
- CAD, working drawings
- Removal of existing plant and pipe work
- Installation of new gas fired boilers
- Installation of new gas fired water heaters
- Installation of new circulating pumps
- Installation of new pressurisation unit
- Thermal insulation
- Installation of new flues
- Associated builderswork
- Flushing and chemical dosing of LPHW installations
- BMS installation
- Chlorination of services
- Flusing and water treatment
- OMI Documention
- Testing and commissioning of all associated services.
- Client Demonstrations