Project Title: Boiler Replacement, Office Building

    Completed: December 2013

    Contract Duration: 3 Months

    Client: BAE Systems

    Main Contractor: BAE Systems

    Contract Value: £114,388

    Description

    A direct works package from BAE for the design and installation of a new boiler plant installation within an existing office building to replace the existing plant which had come to the end of their economic life.

    Services Undertaken:

    • Full contract management
    • CAD, working drawings
    • Removal of existing plant and pipe work
    • Installation of new gas fired boilers
    • Installation of new gas fired water heaters
    • Installation of new circulating pumps
    • Installation of new pressurisation unit
    • Thermal insulation
    • Installation of new flues
    • Associated builderswork
    • Flushing and chemical dosing of LPHW installations
    • BMS installation
    • Chlorination of services
    • Flusing and water treatment
    • OMI Documention
    • Testing and commissioning of all associated services.
    • Client Demonstrations