Project Title: Salford Law School
Completed: September 2008
Contract Duration: 6 Months
Client: University of Salford
Main Contractor: Bardsley Construction
Contract Value: 780K
Description:
Design and construction of a new prestigious law school with teaching space, lecture theatre and library. The three storey building is heated and cooled by a termodeck system utilising the precast floor with floor and ceiling diffusers.
Services Undertaken:
- Full contract management
- Full design, CAD, working drawings
- Termodeck ventilation scheme throughout the building
- Exposed services to all areas
- Mains & Boosted Cold Water System
- Domestic Hot Water System
- Gas Pipe Work Installation
- Low Pressure Hot Water Pipe Work System
- BMS installation
- Gas fired VRF System
- General Supply and Extract Ventilation Systems
- Localised air conditioning systems to high heat gain rooms
- Soil waste and Sanitaryware installations
- Soils and wastes
- Sanitaryware
- Rainwater pipework
- Siphonic Rain water Installations
- Pipework and Ductwork Insulation
- Chlorination of services
- Flusing and water treatment
- OMI Documention
- Testing and commissioning of all associated services
- Client Demonstrations