Project Title: Barton Grange Garden Centre
Completed: September 2008
Contract Duration: 6 Months
Client: Barton Grange
Main Contractor: Direct for the client
Contract Value: 1.01 Million
Description:
A flagship Garden Centre for the Barton Grange Group of Companies, situated in a strategic position on the A6 lying on the outskirts of Preston. The clients brief was to embrace current renewable technologies available, to demonstrate their commitment to the environment.
Services Undertaken:
- Full Design And Procurement
- GSHP installations
- Heat reclaim from Farm-shop refrigeration equipment pre heating DHW system
- LPHW pipework installation
- MCW AND DHW pipework installations
- Gas pipework installations
- Boiler plant installation
- Hot Water plant installations
- VRF & Air conditioning installation
- Ventilation Supply and Extract ductwork
- Soils and wastes
- Sanitaryware
- Rainwater pipework
- Rain water Harvetsing
- Pipework and Ductwork Insulation
- Passive Natural Ventilation Scheme
- Under-floor heating installation
- BMS installation
- Chlorination of services
- Flusing and water treatment
- OMI Documention
- Testing and commissioning of all associated services
- Client Demonstrations