Project Title: Crewe Hall Hotel
Completed: September 2008
Contract Duration: 14 Months
Client: Q Hotel Group
Main Contractor: Eric Wright Construction
Contract Value: 2.8 Million
Description:
The works carried out at Crewe Hall Hotel were carried out in two phases a 45No bedroom extension to the existing building and a 2200m2 extension to the sports and conference facilities, all of which had to integrate with the Hotels existing services. All works were undertaken with the hotel in full operation and as a result of close liaison and planning remained unaffected by the works.
Services Undertaken:
- Full contract management
- Full design, CAD, working drawings
- LPHW pipework installation
- MCW AND DHW pipework installations
- Gas pipework installations
- Boiler plant installation
- Hot Water plant installations
- VRF & Air conditioning installation
- Ventilation Supply and Extract ductwork
- Soils and wastes
- Sanitaryware
- Rainwater pipework
- Pipework and Ductwork Insulation
- Intergration with Pool and Spa services
- BMS installation
- Provision of Main Switchboard, Sub Distribution Boards
- Main and Sub Main Cabling
- Containment Installation-Cable Tray/Basket/Trunking/Dado & Skirting Trunking
- Lighting Installations
- Emergency Lighting Installations
- Lighting Control Systems
- General Power, Earthing & Bonding
- Fire Alarm Installations
- Access Control Systems, CCTV Installations, Disabled Refuge Alarm Systems
- Data & Telephone Structured Wiring
- Power and Control Cabling to Mechanical Services
- Inspection and Testing
- Public Address system
- Voice Alarm system
- Personal attack alarm systems
- Chlorination of services
- Flusing and water treatment
- OMI Documention
- Testing and commissioning of all associated services
- Client Demonstrations