Project Title: Blackpool Council offices

Completed: March 2014

Contract Duration: 74 weeks

Client: Blackpool Council

Main Contractor: Eric wright Construction

Contract Value: 4.3 million

Description:

The new 11600m2 high specification office for Blackpool Council is the first phase of the Talbot Gateway project. The building is based over 5 floors and achieved a BREEAM rating of ” Excellent”.

Services Undertaken:

  • Full contract management
  • CAD, working drawings
  • Passive Natural Ventilation Scheme
  • Air source heat pump
  • LPHW pipework installation
  • MCW AND DHW pipework installations
  • Gas pipework installations
  • Boiler plant installation
  • VRF & Air conditioning installation
  • Ventilation Supply and Extract ductwork
  • Soils and wastes
  • Sanitaryware
  • Rainwater pipework
  • Pipework and Ductwork Insulation
  • BMS installation
  • Provision of Main Switchboard, Sub Distribution Boards
  • Main and Sub Main Cabling
  • Containment Installation-Cable Tray/Basket/Trunking/Dado & Skirting Trunking
  • Lighting Installations
  • Emergency Lighting Installations
  • Lighting Control Systems
  • General Power, Earthing & Bonding
  • Fire Alarm Installations
  • Access Control Systems, CCTV Installations, Disabled Refuge Alarm Systems
  • Induction Loop Systems
  • TV Aerial Installations
  • Data & Telephone Structured Wiring
  • Power and Control Cabling to Mechanical Services
  • Lightning Protection
  • Inspection and Testing
  • Chlorination of services
  • Flusing and water treatment
  • OMI Documention
  • Testing and commissioning of all associated services
  • Client Demonstrations