Project Title: Highfield High School, Blackpool
Completed: August 2013
Contract Duration: 14 Months
Client: Blackpool, Council
Main Contractor: Eric Wright Construction
Contract Value: 4.2 Million
Description:
As part of the BSF news schools program this three storey 12800m2, BREEAM “Excellent”, teaching facility offers a new and open plan teaching environment with large central atrium a 350 Seat Theatre, Design Technology Suite, Drama Studio, Library, Music Suite & Recording Studio, Restaurant, 8 fully equipped science laboratories and specialist rooms, Sports Hall and Specialist Teaching Areas.
Services Undertaken:
- Full contract management
- CAD, working drawings
- Earth Duct ventilation system
- Passive Natural Ventilation Scheme
- Photovoltaic installations
- LPHW pipework installation
- MCW AND DHW pipework installations
- Chilled water pipework insallations
- Gas pipework installations
- Boiler plant installation
- Chiller plant installations
- Hot Water plant installations
- VRF & Air conditioning installation
- Ventilation Supply and Extract ductwork
- Soils and wastes
- Sanitaryware
- Rainwater pipework
- Siphonic Rain water Installations
- Rain water Harvetsing
- Pipework and Ductwork Insulation
- Under-floor heating installation
- Specialist kitchen ventilation
- BMS installation
- Provision of Main Switchboard, Sub Distribution Boards
- Main and Sub Main Cabling
- Containment Installation-Cable Tray/Basket/Trunking/Dado & Skirting Trunking
- Lighting Installations
- Emergency Lighting Installations
- Lighting Control Systems
- General Power, Earthing & Bonding
- Fire Alarm Installations
- Access Control Systems, CCTV Installations, Disabled Refuge Alarm Systems
- Induction Loop Systems
- TV Aerial Installations
- Data & Telephone Structured Wiring
- Power and Control Cabling to Mechanical Services
- Lightning Protection
- Inspection and Testing
- Chlorination of services
- Flusing and water treatment
- OMI Documention
- Testing and commissioning of all associated services
- Client Demonstrations